Lab
What is on the bench
The lab as of 19 November 2026: what shipped, what is in progress and what is waiting. Every line comes from the project's own repo.
On the bench
Private beta
Magic Staff
The r2 1.7 line is in review, and the roadmap runs through r2 1.9. Dilshaus Ventures and Fieldhaus use it as customers and partners.
Simulated
TURR
Aura is the product direction. Ten batches are built and verified against a fictional four-unit fleet; no physical robot is connected yet.
Published
Stitch Wand
Three packages on npm under MIT and a web app at stitchwand.com. Accounts and paid plans are planned, not built.
Demo
Supergentic
Journeys, segments, content and campaigns for Salesforce Marketing Cloud, asked for in plain language. In this version the AI replies are scripted, not live.
Framework
Protowave
Drop one HTML spec into an empty folder, brief an agent, get a working prototype with version cuts, fidelity and device switching, and a built-in sitemap.
Demo
UI Wand
Design system management: finds token drift between Figma and code and generates Figma component libraries. The data is mocked; there is no backend yet.
How the lab works
Numbered releases
Every release has a plan, a test gate and release notes before it ships.
Numbered decisions
Every call goes in a log with a number, so it can be found and undone.
A person for the big steps
Agents propose and build. Anything irreversible stops and waits for a yes.